suoLL Logo
  • about
    • suoLL
    • Caroline Lobo
    • contact us
  • portfolio
    • prior to suoLL experience
    • arcadia high school
    • Chaparral High School
    • EMCC Mariposa Hall
    • GCU Classroom Building
    • GCU College of Arts & Science
    • GCU Fleming Library Repurpose
    • GCU North Gym Lecture Halls
    • Julian Elementary School
    • Papago Elementary School
    • Red Rock High School PAC
    • Reproductive Medical Institute
    • Sedona Unified District Office
    • Verrado High School
    • West Sedona Elementary School
    • Higher Education
    • Basketball Practice Facility
    • canyon activity center
    • gcu baseball stadiumĀ 
    • Interdisciplinary Engineering I
    • Interdisciplinary Engineering II
    • Soccer Stadium
    • Student Life
    • student recreation center expansion
    • Community
    • 32 E Foothill Residence
    • Office Center
    • Student Housing (Apartments)
    • Student Housing (Dormitories)
    • Healthcare (Under Construction)

Interdisciplinary Engineering II

Capstone Labs | Manufacturing Labs | Electrical Engineering Labs | Mechanical Engineering Labs | Physics  Labs| Robotics Lab | Materials Lab | Environmental Sciences Lab | Vivarium | Offices | Learning Studios | Lecture Halls

4 story | 170,000 SF | Phoenix, AZ | 2016

This project is designed to integrate engineering disciplines to promote the idea of hands-on learning and collaboration.  Conceptually the design is Inspired by a cogwheel, reinforcing the idea of interaction and motion.  The building is carefully designed with the principles of passive solar design, bringing to life a learning environment that has numerous indoor and outdoor learning spaces giving the users the opportunity to appreciate the weather patterns of the desert environment.

 

project info